The installation itself will take 1-3 days. But before you can have the system installed, there are a few things that need to occur first. There are a few contracts that need to be signed by the utility company and us. Then you, as the homeowner, will be presented with your plans to be approved before permits are pulled. Once permits are pulled, the installation will occur. After the installation, a city inspector will come to your home and inspect the system to ensure everything was installed correctly and up to city code. The final step is receiving approval from the electric company. Since we are connecting the solar system to the grid, your utility company needs to approve the system to enable net metering. This takes anywhere from 5-15 days. Finally, once you receive PTO or permission to operate from the electric company, you can turn your system on and benefit from the solar energy produced. 