Regional
- Apex to Mesquite and Moapa Valley Corridor Study
- Future I-11 Nevada
- I-15 Central Corridor
- I-15 Corridor System Master Plan
- I-15 Mobility Alliance
- I-15 South Corridor Improvement Sloan Road to Tropicana Avenue Environmental Assessment
- I-515 Alternatives Development Study
- I-515 Charleston Boulevard Interchange Environmental Assessment
- I-80, 2020 Corridor Study
- I-80 Corridor Systems Management Plan (2014)
- I-80, 2009 Corridor Study
- Mt. Rose Highway Corridor Study
- Proposed Las Vegas Stadium Traffic Assessment
- Pyramid Highway/US 395 Connection Environmental Impact Statement (EIS)
- Southern Nevada High-Occupancy Vehicle Plan
- Southern Nevada Traffic Study
- US 50 Dayton Operational Study
- US 50 East Corridor Study 2.1 MB - pdf file
- US 50 Tahoe East Shore Corridor Management Plan
- US 395 Land Use Study
- US 395 Washoe County Corridor Study
- Western Nevada Study
Innovation and Initiatives
- Integrated Transportation Reliability Program
- Pioneer Program
- Complete Streets Policy - Building Roads For All Users
- Rest Area Rebuild Program - Rest Area Design Concepts
Traffic Safety Engineering
- Uncontrolled Crosswalk Treatment Process
- Safety Management Plans
Statewide
Economy
- Connecting Nevada - Planning our Transportation Future
- Cost Allocation Study 2009
- Goods Movement Study
Environmental
- Landscape and Aesthetic Corridor Plans
- Stormwater Management Program
Communications
- Radio Communications-Nevada Statewide Public Safety Radio System
Interested?
If you are interested in this item and have some questions, feel free send an inquiry.
Click Here
On the Go?
Scan our QR code and use your phone to access our catalog.
Nevada Department of Transportation is a proud part of