Wasco Electric Cooperative is currently not accepting new net-metering applications at this time. If WEC does start accepting applications, requirements, and forms are listed below.
Net Metering allows a Member of the WEC to connect certain kinds of generation to the WEC power system. Power generated by the Member more than the Member’s needs will be purchased by WEC.
The amount of net metering connected to the WEC system is limited to 1% of the WEC peak kilowatt system peak.
Interested?
If you are interested in this item and have some questions, feel free send an inquiry.
Click Here